In May 2020, we installed 370 JA Solar panels with 340W of power each at the Electrans factory in Santa Perpètua de Mogoda, with a total installed power of 125.8kW. As it was a corrugated sheet metal roof, the system used was the new CS-ON.
The strengths of the CS-ON system are:
- Coplanar design: it is fully integrated with the building.
- Direct fixing to the roof: secure anchoring and distributes the weight evenly.
- Fixing with waterproofing.
- The system allows free thermal expansion.
- Compatible with the roof material: Does not accelerate roof corrosion.
- Easy assembly.

Solar Panel Structures Santa Perpètua de Mogoda, May 2020.